|
REXROTH HYDRAUDYNE was involved making the hydraulic design.
In conjunction with vessel operators RRH has designed the drilling
operator console.
Find photographs of the status as per January 20, 2004 attached
IHC GUSTO was involved with the structural design of the future drill room.
Hugo Vet from FUGRO ENGINEERS created the
artist impression of the drill room.
The impression is based on the design as after the meeting of December 15, 2003.
In the meantime the design has been slightly modified.
At the same time we do the utmost increasing
the available deck space and to reduce the amount of trip hazards on the work decks.
As part of this plan we would be installing the manual tongs submerged
in the deck as per a FUGRO ENGINEERS’ design.
On April 9, 2004 the drill room conversion was completed.
Attached photographs present the results.
|